
AKIPRESS.COM - The mudflows partially washed away the bridge on the Osh-Nookat-Razzakov road in Nookat district. The bridge was temporary. It was erected with start of major repair of the main bridge.
The temporary bridge was not reinforced with concrete. It was washed out by mudflows.
The temporary bridge was 10 meters wide and 10 meters long.
The main bridge was commissioned in 1968.
